Projects

7.07.2026
From Dispatch to Production in less than two weeks – turnkey 250 kW SOEC Dynamic Electrolyser Unit installed succesfully

18.06.2026
250 kW Solid Oxide Electrolysis for eSAF production delivered

19.02.2026
Dynelectro 1 MW solid oxide electrolyser reached FID at Dutch agri-hydrogen site

10.02.2026
Syntholene Energy: Dynelectro selected as electrolyser supplier

20.03.2024